Shift Tonnes (Day Shift)
74,160 t
↑Plan Attainment
96.8%
↑Avg LHD Cycle Time
28.4 min
↓Rehandle %
4.2%
↑Live data requires Appilico OS subscription. Book a demo for a personalised walkthrough.
Production reports that arrive 4 hours after shift end are too late to act on. Mine Production delivers real-time tonnage, crew performance, and LHD cycle analysis so supervisors can intervene before the shift is lost.
Recover 3-5% of production lost to late decisions
Real-time means you can intervene while the shift is still running.
Key features
Sample insights
Shift Tonnes (Day Shift)
74,160 t
ON TRACKPlan Attainment
96.8%
ON TRACKAvg LHD Cycle Time
28.4 min
AT RISKRehandle %
4.2%
AT RISKIndustry use case
A gold underground operation uses Mine Production to monitor stope advance rates in real time. When a stope falls 15% behind plan mid-shift, the supervisor reallocates a second loader 6 hours earlier than their old manual-check process would have caught it — recovering 800 t of production.
Composite case study based on Australian Pilbara iron ore operations
Integrations
Don't see yours? Contact us — we integrate with most ODBC-compatible systems.
Download sample data
Representative Australian mining dataset used to build this dashboard. CSV format.
Related dashboards
See it on your data
Book a 15-minute demo and we'll show you the Mine Production dashboard running on a dataset representative of your operation.