Starter+

Mine Production

Shift-level production intelligence — from drill to stockpile.

Mine Production — Live Preview
Connected

Shift Tonnes (Day Shift)

74,160 t

ON TRACK

Plan Attainment

96.8%

ON TRACK

Avg LHD Cycle Time

28.4 min

AT RISK

Rehandle %

4.2%

AT RISK

Live data requires Appilico OS subscription. Book a demo for a personalised walkthrough.

The Problem

Production reports that arrive 4 hours after shift end are too late to act on. Mine Production delivers real-time tonnage, crew performance, and LHD cycle analysis so supervisors can intervene before the shift is lost.

The Outcome

Recover 3-5% of production lost to late decisions

Real-time means you can intervene while the shift is still running.

Key features

Real-time tonnage vs plan (shift / day / week / month)
Shift-level Gantt with crew and equipment breakdown
Load-haul-dump cycle time analysis
Drill & blast performance tracker
Material movement and rehandle tracking
Production reconciliation: model vs actual
Shift handover report (auto-generated PDF)

Sample insights

Shift Tonnes (Day Shift)

74,160 t

ON TRACK

Plan Attainment

96.8%

ON TRACK

Avg LHD Cycle Time

28.4 min

AT RISK

Rehandle %

4.2%

AT RISK

Industry use case

A gold underground operation uses Mine Production to monitor stope advance rates in real time. When a stope falls 15% behind plan mid-shift, the supervisor reallocates a second loader 6 hours earlier than their old manual-check process would have caught it — recovering 800 t of production.

Composite case study based on Australian Pilbara iron ore operations

Integrations

Pitram
Wenco
MineStar
Micromine
Deswik

Don't see yours? Contact us — we integrate with most ODBC-compatible systems.

Download sample data

Representative Australian mining dataset used to build this dashboard. CSV format.

Related dashboards

See it on your data

Book a 15-minute demo and we'll show you the Mine Production dashboard running on a dataset representative of your operation.