Tonnes Mined (today)
148,320 t
↑Fleet OEE
72.4%
↓TRIFR (rolling 12m)
3.2
↓Cost per Tonne
A$14.80
↑Live data requires Appilico OS subscription. Book a demo for a personalised walkthrough.
Mine GMs waste the first hour of every day chasing numbers across six systems. The Executive Cockpit puts production, safety, cost, and equipment status on one screen, updated every 15 minutes.
40 minutes faster to every critical decision
Replace morning report chaos with a single source of truth.
Key features
Sample insights
Tonnes Mined (today)
148,320 t
ON TRACKFleet OEE
72.4%
AT RISKTRIFR (rolling 12m)
3.2
ON TRACKCost per Tonne
A$14.80
AT RISKIndustry use case
A three-site Pilbara iron ore operator runs the Executive Cockpit on the boardroom screen at 6:30 AM. The GM sees an At Risk flag on Fleet OEE at Site 2 before the shift handover meeting ends — maintenance is dispatched 40 minutes earlier than it would have been under the old report cycle.
Composite case study based on Australian Pilbara iron ore operations
Integrations
Don't see yours? Contact us — we integrate with most ODBC-compatible systems.
Download sample data
Representative Australian mining dataset used to build this dashboard. CSV format.
Related dashboards
Mine Production
Shift-level production intelligence — from drill to stockpile.
Equipment OEE
Know your fleet's true performance — before maintenance comes to you.
Cost Variance
Know your cost per tonne before the month is over.
Safety & Compliance
Zero harm starts with the right leading indicators — before an incident happens.
See it on your data
Book a 15-minute demo and we'll show you the Executive Cockpit dashboard running on a dataset representative of your operation.