Mining Cost/Tonne (MTD)
A$14.30
↑Budget Variance (MTD)
+A$0.80/t
↑Diesel Cost (L/BCM)
0.48 L/BCM
↑Labour Cost/Tonne
A$4.20
→Live data requires Appilico OS subscription. Book a demo for a personalised walkthrough.
Month-end cost reports arrive too late to change behaviour. Cost Variance gives finance and operations a daily view of cost per tonne, with AI-powered alerts when anything spikes outside tolerance.
Identify cost blowouts 2–3 weeks earlier
Stop chasing last month's costs. Act on today's.
Key features
Sample insights
Mining Cost/Tonne (MTD)
A$14.30
AT RISKBudget Variance (MTD)
+A$0.80/t
AT RISKDiesel Cost (L/BCM)
0.48 L/BCM
CRITICALLabour Cost/Tonne
A$4.20
ON TRACKIndustry use case
A coal mine GM notices diesel cost per BCM spiking 18% above budget in the Cost Variance dashboard on Day 12 of the month. Investigation reveals a pump inefficiency in the dewatering system — fixed by Day 15, saving A$380K before month end.
Composite case study based on Australian Pilbara iron ore operations
Integrations
Don't see yours? Contact us — we integrate with most ODBC-compatible systems.
Download sample data
Representative Australian mining dataset used to build this dashboard. CSV format.
Related dashboards
See it on your data
Book a 15-minute demo and we'll show you the Cost Variance dashboard running on a dataset representative of your operation.